Study & Design of Helipads on Highways

KSA

Project Description

The project involves the design of 15 helipads at locations specified by the General Design Administration, with each helipad strategically integrated into or positioned adjacent to the roadway based on the most suitable alternative determined through comprehensive site-specific studies. The combined length of the helipads is approximately 6,220 meters. Each helipad is designed to include two bypass zones, two takeoff readiness zones (turning areas), and a dedicated parking area measuring 120×60 meters, capable of accommodating two aircraft. This design ensures functionality, efficiency, and adherence to aviation and safety standards, optimizing the helipads for operational readiness and accessibility.

Client

Scope of Work

  • Surveying works and survey report, including expropriation sheets.
  • Hydrological and hydraulic studies.
  • Geological and geotechnical studies.
  • Engineering planning.
  • Structural design for all types of bridges.
  • Field and laboratory studies of soil layers at the foundations of bridges.
  • Lighting and safety measures.
  • Bill of quantities.

Project Highlights

Project Duration: 

12 Months

Two bypass zones per helipad

Total Combined Length:

6,220 meters

Dedicated parking area:

120×60 meters, accommodating two aircraft

l

Design of 15 helipads

Related Projects

Existing Air Traffic Control Tower - Gap Analysis
Marsa Matrouh - Salloum Road Dualization Project
KEC - Design Review for ALYIAA OFFICES & AMENITIES