Design of Coastal & Internal Roads and Flood Protection for Red Sea Project

Amluj, KSA
  • Home
  • 9
  • Projects
  • 9
  • Design of Coastal & Internal Roads and Flood Protection for Red Sea Project

Project Description

The project encompasses comprehensive studies and designs for critical infrastructure elements aimed at optimizing connectivity, safety, and environmental sustainability. Key components include:

  • Internal Roads (Primary and Secondary): Design of the main site compound’s internal primary and secondary road networks to facilitate efficient internal traffic flow.
  • Access Roads: Permanent access road to Shurayrah Crossing and H5 to Mainland North Jetty, along with interconnecting haul roads within Bridgepoint.
  • Entry and Exit Roads: Development of entry and exit routes to individual plots within Bridgepoint for seamless accessibility.
  • H5 Junction Connectivity: Construction of connecting roads for the H5 Junction, including fencing for the median to enhance safety and delineation.
  • Airport and Barrow Area Access Road: Upgrading, widening, and resurfacing of access roads, ensuring durability and improved usability.
  • Lane Deviation: Implementation of northbound and southbound lane deviations as required.
  • Traffic Calming Measures: Speed reduction strategies, including road calming on the H5 Road, with a target speed limit of 60 km/h.
  • Junction and U-Turn Enhancements: Improvements to existing junctions and U-turns for better traffic flow and safety.
  • Wadi Protection: Implementation of dikes for Wadi protection to mitigate flood risks and ensure resilience against natural elements.
  • Solar Lighting: Integration of sustainable lighting solutions, such as solar-powered systems, to enhance visibility while reducing environmental impact.
  • Culverts (If Required): Potential design and incorporation of culverts to address drainage and water flow needs.

Client

Scope of Work

  • Field investigations and alignment selection
  • Hydrological Studies;
  • Completing geometric and pavement design for roads;
  • Quantities survey and Cost Estimate.

Project Highlights

Project Duration: 

8 Months