Qatif - Awamiya - Safwa & Jesh - Anaak Roads
Project Description
This project encompasses the construction and paving of a dual carriageway for Qatif/Awamiya/Safwa Road (6.518 km) and Jesh/Anaak Road (4.672 km) in the Eastern Region. The scope includes the installation of culverts for stormwater drainage, the construction of retaining walls, and electrical and civil works for street lighting, traffic signals, and geotextile protection layers. The project is designed to enhance connectivity between Qatif districts and major highways, alleviating traffic congestion and improving overall traffic flow in the region.
Client
Scope of Work
The project scope includes the following enhanced services for comprehensive design and construction supervision:
Design Review of Roads and Structural Works:
Thorough evaluation and review of all road designs and structural works to ensure they meet safety standards, regulatory requirements, and project specifications. This includes addressing design challenges and proposing improvements for optimized functionality and durability.
Construction Supervision:
- Traffic Management during Construction: Effective management of traffic flow and safety during the construction phase, ensuring minimal disruption and safeguarding public and worker safety.
- Quality Control: Rigorous inspection, testing, and evaluation processes to ensure that all materials and work performed meet the highest quality standards and regulatory requirements.
- Time and Progress Control: Continuous monitoring of project timelines, tracking milestones, and implementing corrective measures to address delays, ensuring the project stays on schedule.
- Contract Administration: Management of all contract-related activities, including the timely processing of variation orders, resolving disputes, and overseeing claims management to maintain project integrity and minimize risks.
- Contractor’s Submittals Review and Approval: Detailed review of contractor submittals such as materials, shop drawings, and method statements, ensuring full compliance with project specifications and regulatory standards.
- Risk Management and Control: Proactive identification, assessment, and management of risks throughout the construction process, ensuring that potential issues are addressed promptly and effectively.
- Payment Certificates Review and Approval: Careful verification of payment certificates, ensuring they reflect work completed to date and comply with contractual terms before approvals are made.
- Project Documentation and Reporting: Comprehensive maintenance of all project documentation, including progress reports, meeting minutes, and change logs, ensuring clear communication and proper record-keeping for all stakeholders.
- Review of As-Built Drawings and Final Payment Certificate: Final review of as-built drawings to confirm accurate representation of completed works, and validation of the final payment certificate to ensure that all contractual obligations are fulfilled before project closure.
These enhanced services ensure efficient project execution, adherence to timelines, budget control, and compliance with quality and safety standards, contributing to the successful and seamless completion of the project.
Project Highlights
Project Duration:
54 Months
Dual Carriagewy
Qatif/Awamiya/Safwa Road Length: 6.518 km
Jesh/Anaak Road Length: 4.672 km