Safwa - Rahima Road (Inshore & Offshore Works)
Project Description
This project serves as a crucial transportation route in the region, significantly enhancing the connectivity of Ras Tanura Governorate. By providing an additional entry and exit point to Ras Tanura, it effectively reduces travel time by one hour and establishes vital links to Dammam, Qatif, and King Fahd International Airport, supporting both regional mobility and economic growth. Spanning 15.45 km, the project includes a striking 718.8-meter sea bridge, which forms a key component of the connection between Ras Tanura and Safwa. Additionally, it involves the construction of a bridge at the Safwa roundabout to further enhance traffic flow. The project scope also includes extensive roadworks, lighting installation, and traffic safety measures, all designed to improve the overall efficiency and safety of the route. With a total cost of 413,557,400 SAR, this project is a transformative infrastructure development that will foster greater accessibility, reduce congestion, and bolster the region’s connectivity.
Client
Scope of Work
The project scope includes the following enhanced services for comprehensive design and construction supervision:
Design Review of Roads and Structural Works:
Thorough evaluation and review of all road designs and structural works to ensure they meet safety standards, regulatory requirements, and project specifications. This includes addressing design challenges and proposing improvements for optimized functionality and durability.
Construction Supervision:
- Traffic Management during Construction: Effective management of traffic flow and safety during the construction phase, ensuring minimal disruption and safeguarding public and worker safety.
- Quality Control: Rigorous inspection, testing, and evaluation processes to ensure that all materials and work performed meet the highest quality standards and regulatory requirements.
- Time and Progress Control: Continuous monitoring of project timelines, tracking milestones, and implementing corrective measures to address delays, ensuring the project stays on schedule.
- Contract Administration: Management of all contract-related activities, including the timely processing of variation orders, resolving disputes, and overseeing claims management to maintain project integrity and minimize risks.
- Contractor’s Submittals Review and Approval: Detailed review of contractor submittals such as materials, shop drawings, and method statements, ensuring full compliance with project specifications and regulatory standards.
- Risk Management and Control: Proactive identification, assessment, and management of risks throughout the construction process, ensuring that potential issues are addressed promptly and effectively.
- Payment Certificates Review and Approval: Careful verification of payment certificates, ensuring they reflect work completed to date and comply with contractual terms before approvals are made.
- Project Documentation and Reporting: Comprehensive maintenance of all project documentation, including progress reports, meeting minutes, and change logs, ensuring clear communication and proper record-keeping for all stakeholders.
- Review of As-Built Drawings and Final Payment Certificate: Final review of as-built drawings to confirm accurate representation of completed works, and validation of the final payment certificate to ensure that all contractual obligations are fulfilled before project closure.
These enhanced services ensure efficient project execution, adherence to timelines, budget control, and compliance with quality and safety standards, contributing to the successful and seamless completion of the project.
Project Highlights
Project Duration:
36 Months
Investment:
413,557,400 SAR
718.8-meter sea bridge connecting Ras Tanura and Safwa
Total Length:
15.45 km
Bridge at Safwa roundabout to improve traffic flow