Road Rehabilitation and Maintenance

Road Rehabilitation and Maintenance

Project Description The supervision of the following contracts plays a pivotal role in enhancing the infrastructure and urban environment of Al Madinah. These projects are aimed at improving key aspects of the city’s road networks, lighting systems, and essential...
2nd Ring Road – Tandabawi Street (Phase 2)

2nd Ring Road – Tandabawi Street (Phase 2)

Project Description The project represents the second phase of the Second Ring Road project in Makkah, with a length of 5 km. It includes the construction of a dual carriageway with three lanes in each direction, along with a central median. Additionally, service...
The Al-Laith – Makkah Road

The Al-Laith – Makkah Road

Project Description The project involves completing the dualization of the Al-Laith-Makkah road in three phases, covering a total length of 103.5 km. The Al-Laith/Makkah Al-Mukarramah Road, also known as the Old Coastal Road, is a critical route for pilgrims traveling...
Al Shamsi – Al kar Road

Al Shamsi – Al kar Road

Project Description The project involves completing the dualization of the Al-Shamsi-Al-Kar road in three phases, covering a total length of 14.9 km. This road plays a vital role as the southern section of the Fifth Ring Road in Makkah Al-Mukarramah, facilitating...
Al-Jumum-Al-Zima Road

Al-Jumum-Al-Zima Road

Project Description The project involves the dualization of the Al-Jumum-Al-Zima road across four phases, covering a total length of 29.5 km. This road is of significant importance, being one of the most heavily trafficked routes in the Kingdom, particularly for the...